logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대전지방법원 2018.08.08 2016가단218086
손해배상(기)
Text

1. The Defendants jointly share KRW 4,646,40 with respect to the Plaintiff and KRW 5% per annum from April 2, 2016 to August 8, 2018.

Reasons

1. Basic facts

A. The Plaintiff is a company engaged in the business of manufacturing and selling high-pressure gas, selling liquefied petroleum gas, etc., and the Defendant A leased caters (C; hereinafter “instant caters”) owned by the Plaintiff while running equipment leasing and leasing business. Defendant B is an employee of Defendant A who drives the instant caters according to Defendant A’s instructions.

B. On April 2, 2016, Defendant B, within the Defendant’s factory, engaged in the work of getting off and getting off the said cargo vehicle while carrying 13 tons of the 13th ton of the 13th ton of the cargo tank loaded on the cargo vehicle (hereinafter “the Initial temperature tank in this case”) at the Defendant’s factory at two points higher than the upper high-level, and one part of the bridge of the Initial temperature tank in this case at the 1st ton of the instant cargo vehicle, Defendant B coming up with the string of the said cargo vehicle, and led to a situation of self-reliance as it is impossible to view the weight of the string tank in this case.

[Ground of recognition] Facts without dispute, Gap evidence Nos. 1, 2, Eul evidence Nos. 5 and 6, the purport of the whole pleadings

2. Occurrence of liability for damages;

A. When Defendant B connects the instant super-high temperature tank to the instant super-high temperature tank to load and unload the instant super-high temperature tank with a trucking vehicle, Defendant B is likely to destroy the instant super-high temperature tank because the part of the eleg connecting the eleg to the eleg side of the instant super-high temperature tank in light of the quality of the eleg, strength, etc., if the part of the eleg connecting the eleg to the eleg side of the instant super-high temperature tank, the eleg part of the eleg is not visible to the eleg part of the instant eleg and the eleg part of the instant eleg might be damaged. Accordingly, Defendant B, who is engaged in the instant work, such as heavy e.g., the instant e., the e., the instant e., the e., the e., the instant e., the e., the e., the e., the instant e., the e., the instant e. the e. the tank.

arrow