Defendant

A Imprisonment for 4 months, Defendant B’s imprisonment for 6 months, Defendant C, and Company D respectively, shall be punished by a fine of 8,000.

Reasons

Punishment of the crime

1. Defendant A and Defendant B owned six pumps with the trade name of “F” in E in E, and leased pumps to the construction site. Defendant A is an employee of F Co., Ltd. who is in exclusive charge of operating and managing G pumps among the six pumps.

Defendant

On November 1, 2017, A under the direction of Defendant B, ordered the order from the Gag-gu Office of Yong-si on November 14:10, 2017, and operated and operated the above G pumps, which are installed at the end of the road at the location of the construction of the Heung-gu H (one section) installed in the lower part of the road, about 80cm in height, and about 25cm in width, for the production of retaining walls.

Defendant B, as the owner of the above pumps, had a duty of care to prevent accidents due to damage to pumps during construction, such as precise inspection of the above pumps and detailed confirmation and management of the state of the boom boom boom boom booms whose vibration in concrete instruction is accumulated, as the owner of the above pumps, and Defendant A had a duty of care to prevent accidents due to damage of pumps during construction. Defendant A, as an exclusive operator of the above pumps, has a duty of care to carefully examine the state of the above pumps and the boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom.

Nevertheless, at around 14:40 on November 1, 2017 due to negligence of neglecting the above duty of care, the Defendants were victims I, who, during the above construction site on the part of the upper part of the above pumps in the wall of the wall of the retaining wall, have been deprived of the booming booming part of the entrance from concrete to the floor at the moment of the boom booming boom.