(영문) 서울고등법원 2015.02.12 2013나2024472
채무부존재확인
Text

1. All appeals filed by the plaintiff and the defendant are dismissed.

2. The costs of appeal shall be borne by each party.

The purport of the claim and appeal is the purport of the appeal.

Reasons

1. Basic facts

A. 1) The contract number for the supply of automatic air weather observation equipment in 2006 : 206. 3. The contract number for the supply of automatic air weather observation equipment: 623,590,000 won: the date of delivery: 0.15% compensation for delay: 0. 30 October 30, 2006. [Special Conditions for Contracts] the Plaintiff shall deliver (manufacture/Installation) the indicated goods under the contract, and the Defendant shall pay the price to the Plaintiff. (2) The inspection method of quality assurance (quality control system standards) and the inspection institution are as follows. (4) The inspection institution shall, in lieu of the inspection conducted by the Plaintiff, notify the Plaintiff of the fact that the delivery of the goods is in excess of the standard of the contract amount, and (2) the delivery or exchange of the goods is in excess of the standard of the contract amount. (3) The delivery or exchange of the goods shall be made within the same period as the time the Plaintiff notifies the Plaintiff of the fact that the goods is in excess of the standard of the contract.

arrow