(영문) 서울고등법원 2019.02.15 2018나2039103
공사대금
Text

1. The part of the judgment of the court of first instance against the plaintiff corresponding to the amount ordered to be paid below shall be revoked.

The defendant.

Reasons

1. Facts of recognition;

A. On January 30, 2015, the Defendant entered into a contract for construction work with the said company to provide materials, equipment, design, and technical support necessary for the installation of the above 8 billion Won (No. 20 evidence) from E company (i.e., the instant construction contract, etc.) to E company specializing in the development of the Myanmar, with the content that the Defendant would build a balone between C members and D, which are in the difficulty of the development of the Myanmar, and that the Defendant would receive approximately KRW 2.1 billion of the price for the construction of the foundation for the balone (8 billion). In addition, around October 2015, the Defendant entered into a contract with the said company with the “I company”, a local company of the Myanmar, to provide the said company with the floor terminal, terminal, terminal, parking lot, pedestrian, and the foundation for the balone project.

(B) Around April 7, 2016, the Defendant entered into a contract for construction works (hereinafter “instant construction contract”) with the Plaintiff, setting the construction cost of KRW 2 billion (excluding value-added tax), from April 7, 2016 to April 6, 2017, on which the Plaintiff entered into a contract with the Plaintiff for construction works (hereinafter “instant construction works”) under the terms and conditions for the payment of the construction cost (No. 1 evidence and No. 24 of the evidence 24) (hereinafter “instant construction contract”).

1. On April 10, 2016, the contract deposit (1j) (2) 15% (5%) 300 million won (10%) : On May 2, 2016, after the completion of the installation of the upper and lower-class Ancor on April 10, 2016, the intermediate payment (1j) (2j) (3j) 65% (5%) (20%) (20%) (20%) 1.3 billion won (20%) 1.4 billion won (20%) 1.4 billion won after the completion of the installation of an Ancor based on an Ancor: on June 2016, before the completion of the installation of the steel tower based on an Ancor.

3. Completion after the completion of a trial run (within 60 days) after the completion of installation of a steel tower, 20% (10%) 20% (10%) 40 million won (10%) 200 million won (20 million won).

B. On July 2016, the Plaintiff started construction of the instant construction and installed the basic poppy of the upper and lower parts of the construction around July 2016, the manufacture of steel tower for difficult stones around November 2016, and around January 2017.