logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원 성남지원 2018.09.21 2018가합402570
근저당권말소
Text

1. The Defendant, on July 201, shall provide the Plaintiff with the Suwon District Court's Sung-nam Branch Office for the real estate stated in the attached list.

Reasons

1. Facts of recognition;

A. B (hereinafter “B”) related to the ownership of the site, building, etc. of the instant factory (hereinafter “instant factory”) was operating 6 buildings and various facilities on the land outside Gwangju-si and 9 lots (hereinafter “instant factory”). The ownership relationship of each real estate constituting the instant factory is as follows.

In attached Table 1, where the land owned by B related to the ownership of the site and building for the instant factory in Gwangju-si, Gwangju-si, a building of 321 square meters in D-si, Gwangju-si, Gwangju-si, a building of 321 square meters in D-si, and a building of 4 lots 235 square meters in size, G 130 square meters in G-type land, 346 square meters in G-type land, 347 square meters in G-type land, 547 square meters in G-type land, 153 square meters in J-type land, 153 square meters in J-type land, and 93 square meters in J-type, a building of 153 square meters in Seoul-si, Gwangju-si, a two-story and 2-story of G-based steel structure, a lubal lubial roof, and the real estate and real estate in the list of the Plaintiff-type factories owned by the Plaintiff.

The two-story factory of reinforced concrete 1, No. 4, located outside Gwangju City, Gwangju Metropolitan City, of a factory site of 1373 square meters, L 394 square meters, and M 344 square meters of a building in Gwangju Metropolitan City of 4,000 square meters;

B. The conclusion of each of the instant mortgage contracts is 1) our bank (hereinafter “Korea bank”).

(1) On July 20, 201, the Plaintiff, the representative director of the Plaintiff, B, and B, as security for loan obligations to the Bank of Korea on July 20, 201, refers to the land, buildings, etc. listed in Table 1 attached hereto (hereinafter collectively referred to as “each of the instant real estate”) owned by the Plaintiff, B, and the term “the instant real estate” refers to the real estate listed in the attached list owned by the Plaintiff among the instant real estate.

(2) According to the aforementioned mortgage contract, the Suwon District Court Sung-nam Branch of Gwangju District Court received on July 21, 2011 and received on July 21, 2011, respectively, issued a mortgage contract with the debtor B, the maximum debt amount of KRW 480,000,000,000 as the bank.

arrow