logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2016.09.28 2014가합512362
손해배상(기)
Text

1. As for Defendant Yellow Construction Co., Ltd., the following:

A. The plaintiff Samsung Fire Marine Insurance Co., Ltd. and Dong Fire Insurance Co., Ltd.

Reasons

1. Facts of recognition;

A. The Home Packer Corporation and the Defendants’ Terms and Conditions 1) The Home Packer Co., Ltd. (the Samsung Titco Co., Ltd. before the mutual change; hereinafter “ Home Packer”).

A) around 2010, the Home Plus Corresponding store located in the 540-1, Seocheon-gu, Seocheon-gu, Seocheon-gu, 2010 (hereinafter “instant store”).

(2) The construction of extending the outer rooftop to three floors (hereinafter referred to as “instant extension construction”).

On February 2010, the defendant window Urban Construction Corporation (hereinafter referred to as the "Defendant window City") will be the defendant window.

) A service contract (hereinafter “instant design service contract”) with respect to the overall work of design and design;

Around March 2010, Defendant Korea-U.S. Global architect (hereinafter “Defendant Korea-U.S. Global architect”) was concluded.

) On-site construction management (CM) services contracts for the instant extension works (hereinafter “instant CM services contract”)

(2) On April 1, 2010, the Home Pul General Construction Co., Ltd. (hereinafter “Defendant Yellow Construction”) entered into a contract for the instant extended construction (hereinafter “instant contract”). Defendant Yellow Construction Co., Ltd. (hereinafter “Defendant Samsung Machinery Co., Ltd”) subcontracted each of the electrical construction and electrical construction and electrical fire-fighting works to Defendant Samsung Machinery Co., Ltd. (hereinafter “Defendant Samsung Machinery Co., Ltd”).

3) Defendant U.S.A. Corporation (hereinafter “Defendant U.S. Corporation”)

(1) From April 26, 2010, Defendant MIM Co., Ltd. (hereinafter “Defendant M&P”) performed fire-fighting supervision services regarding the instant extension works, and Defendant M&P Co., Ltd. (hereinafter “Defendant M&P”).

A) From 2010 to 2010, the Home Plus and facility management services contract (hereinafter “instant facility services contract”).

(B) conclude the instant construction and manage the facilities of each of 50 stores of the Home Plers. B. The completion of the instant extended construction and the progress of the additional construction are 1).

arrow