(영문) 춘천지방법원영월지원 2014.03.13 2013가합685
계약이행
Text

1. The Defendant’s KRW 1,500,000 as well as the Plaintiff’s annual rate from August 8, 2013 to March 13, 2014.

Reasons

1. Basic facts

A. On June 9, 2009, the Defendant completed the registration of ownership transfer on the ground of sale due to voluntary auction with respect to the land of 4169 square meters (hereinafter “land before subdivision”).

B. On September 19, 2009, the Defendant entered into a contract with the Plaintiff to sell 92 square meters of land (hereinafter “instant land” in attached Form 1 of 300 square meters; hereinafter “instant contract”) among the land before subdivision of KRW 10,50,000 (hereinafter “the instant contract”) and entered into a special agreement with the Plaintiff that “61 square meters of land shall be treated under mutual consultation after the partition survey.”

In addition, the defendant concluded a civil engineering contract on the land of this case between the plaintiff and the same day, and the main contents are as follows.

Article 1 (Prohibition of Rent) The buyer shall pay the seller for the costs of land civil engineering works as follows:

1. Construction cost: Twenty-two thousand won;

2. Contract deposit: 7,000,000 won.

3. Balance: 15,500,000 won.

1. The seller shall complete the necessary civil engineering works before the transfer registration of ownership to the buyer simultaneously with the receipt of the down payment of the construction works, and deposit the funds for the costs of civil engineering works at the time of transfer registration;

2. The Civil Works Corporation shall deliver C after completion of work the following:

(2) Construction works for the construction of water supply and drainage pipes, communications pipes, pipes related to electric power stations, and works for the installation of oil tanks in each parcel of land after completion and division of the former C’s land plane work.

B. The Defendant, based on the annexed Form 1, requested a boundary survey on the land before subdivision to the site surveying and designing branch office based on the annexed Form 1, received a provisional partition by annexed Form 2 from the site surveying and designing branch office, and again requested a boundary survey to the Korea Cadastral Construction Corporation branch office based on the annexed Form 2 provisional partition, and received a divisional survey drawing (No. 1-4) from the Korea Cadastral Construction Corporation’s branch office.

After December 28, 2009.