Text
1. The plaintiffs' primary claims are dismissed.
2. Each of the plaintiffs' respective defendant is going through the Housing Redevelopment Improvement Project.
Reasons
1. Basic facts
A. The defendant is a housing redevelopment and rearrangement project partnership with the approval of the establishment of a housing redevelopment project (hereinafter "the head of Seo-gu, Daejeon Metropolitan City") for the purpose of implementing the housing redevelopment improvement project (hereinafter "the redevelopment project of this case") in the Seo-gu, Daejeon District (hereinafter "the improvement zone of this case"). The plaintiffs share the spaces of each floor of the building of this case within the improvement zone of this case (hereinafter "the building of this case" of this case as shown in the following table, and all of the spaces of each floor of the building of this case are "the household of this case" of this case.
The specific dwelling location of the Plaintiff A on June 2, 1699 is as shown in attached Table 1, among the buildings of this case, the number of buildings and housing units with two floors of reinforced concrete 414.6 square meters in Seo-gu, Daejeon, Seo-gu, Daejeon, and its ground, and cement brick sloping roof, 245.7 square meters in a single-story reinforced concrete store, 245.7 square meters in a second-story cement brick house, 234.78 square meters in a two-story cement brick house, and 70.7 square meters in a reinforced concrete sliding room in a reinforced concrete structure, which is a reinforced concrete building, Seo-gu, Daejeon, Daejeon (hereinafter “instant building 1”).
2. 28/414.6 Plaintiff B 368.62/551.6 Plaintiff C 44.41/51.6 Plaintiff C 44.41/51.6 Plaintiff C 44.41/51.6 Plaintiff D 54.31/51.6 Plaintiff E 25.3/414.6 Plaintiff E 66.62/58.62/51.18.2, 50/41.62/51.6, 50/41.6/47.6/51.6/51.6/51.6/518.6/41.6/51.6/51.6/518/518/518.6/42/41.6/18.6/2, 207.2, 24.7.2, 2, 47.2, 47.2, 2, 47.2, and 14, 247.4, m2.
10.645/161.69