(영문) 서울중앙지방법원 2019.01.31 2016가합526723
임금
Text

1. The defendant stated the "retirement Allowance" in the annexed retirement allowance calculation sheet to the plaintiffs, respectively, as well as the corresponding money.

Reasons

A. The purpose of this Agreement is to stipulate the terms and conditions of a contract on raw materials, manufacturing equipment, manufacturing place, etc. under a contract for the supply of crops under a contract for the supply of crops in cases where Party A’s production is difficult or the completion of the manufacture of finished products is delayed and Party B’s property damage is incurred to Party A due to the delay in the supply of the manufactured products intentionally or by gross negligence due to Party B’s death or the injury and injury to Party B’s death, and the supply of the manufactured products becomes impracticable due to Party B’s death.

1. (i) A shall provide B with raw materials necessary for the supply of crops;

In addition, manufacturing facilities, manufacturing places, etc. are leased.

Sheb B shall pay Party A fees for raw materials and fees related thereto (hereinafter referred to as “user fees”).

Article 28(1) of the Fidelity shall be as follows:

* Raw material cost: Fees for the use of production facilities: Won * Book 10,000 per month (Won 10,000): Fees for the location lease * The cost of materials in Won 30,000 (Won 30,000) per month can not be calculated by the liquidity gap, and thus the deduction shall apply.

Applicant The cost of raw materials may be deducted from the supply price of the production because it is changed from the original change, design change, etc.

(v)in the case of joint purchase of working clothes for the production place environment, etc., A shall arrange for the purchase, and the price shall be borne by B.

⑹ 계약기간은 체결일로부터 1년으로 한다.

3. The obligation of Party A (i) shall be provided with high-quality raw materials, and if the damage would be inflicted on Party B due to any defect in the raw materials, the compensation shall be made;

Sheet A shall pay full remuneration so that manufacturing equipment is not worn, and compensate for the damage incurred due to the deterioration of manufacturing equipment.

Consolidatedly, A shall provide a place that does not interfere with B’s work and use B’s place freely.