Text
1. The Defendant’s KRW 269,820,60 for the Plaintiff and KRW 5% per annum from March 16, 2016 to November 29, 2019.
Reasons
Facts of recognition
C is an individual entrepreneur who operates a business such as leasing a cream on the construction site with the trade name of D.
On November 13, 2014, the Plaintiff is an insurer who entered into a construction machinery insurance contract (hereinafter referred to as “instant insurance contract”) with C and its 550 tons of shares as the subject matter of insurance, setting the insurance period from November 13, 2014 to November 13, 2015.
The Defendant is a company that has been awarded a contract for FF Road Packing Works (hereinafter referred to as the “instant construction”) at the time of strike ordered by Gyeonggi-do, and G (hereinafter referred to as the “G”) is a company that received a subcontract from the Defendant for the construction work that manufactures and conducts a PSC beam in H principal angle during the said construction work.
C from July 17, 2015 to July 19, 2015, to G, and accordingly, C transferred the instant tea to the construction site from July 17, 2015 to July 19, 2015.
On July 18, 2015, around 08:15, 08: 08:15, H2 bridge angle in the construction site of this case: (a) L, an engineer belonging to K in J operation, was driving a MPle, and L, an engineer belonging to K in P3 curriculum, was engaged in a PSC beam operations; (b) the sn beam felled on the ground; (c) the sn beam was killed; and (d) the sn beam was killed; and (e) the sn beam carried out on the sn beam through P2 angle and died; and (e) the snick was destroyed due to the instant accident.
The results of analyzing the causes of the accident in the Gyeonggi-do Construction Accident Investigation Committee, etc. after the accident in this case are as follows.
The Construction Accident Investigation Committee of Gyeonggi-do Construction Headquarters: A result of analyzing the status of the transformation of a separate salved salves and a salved salves and the status of the salves of the salves of the PSC beam upper part of the PSC beam and the state of damage to the surface of the salves of the salves of the salves.