logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원 2018.07.19 2016가합78574
하자보수금 등 청구의 소
Text

1. The defendant shall pay to the plaintiff KRW 2,197,209,785 and KRW 201,00,000 among them, from August 30, 2016, and KRW 1,996, and KRW 209.

Reasons

1. Basic facts

A. The Plaintiff is an autonomous management body organized by the occupants to manage A Apartments (hereinafter “instant apartment”) 14 Dong-dong 1382 households located in G in Kimpo-si, Kimpo-si, and the Defendant is a project proprietor who constructed and sold the instant apartment, and the Intervenor’s Intervenor is the subcontractor who performed the instant new apartment construction work.

B. On February 28, 2013, the apartment of this case filed a claim for the occurrence of defects and the repair of the apartment of this case, which was approved for use on and around that time. The Defendant, while constructing the apartment of this case, did not construct the part to be constructed in accordance with the design drawing, or revised differently from the design drawing and constructed the apartment of this case, thereby causing defects such as rupture, water leakage, etc. to the public and exclusive part of the apartment of this case. Accordingly, the apartment of this case caused trouble in the function and safety of the apartment of this case.

Therefore, the plaintiff requested the defendant to repair the defects at the request of the tenant or sectional owner of the apartment of this case, but the public use and the section for exclusive use of the apartment of this case contains any defects such as the sum table of repair costs by the annexed list of defects (hereinafter "the defect of this case"). In order to repair the apartment of this case, the plaintiff and the defendant's application for the supplementation and inquiry of the defect repair cost in accordance with the premise that the error was modified or the opinion was modified, the result of correction and supplementation was reflected.

It is necessary to cost the same amount as the description.

Details of the Repair Expenses Table (unit: unit) 488,974,51162,321,74,71,77, and 536,421,74,721,742,721,742,432,71,712,432,432,432,432,432,712,431,252,1372,604,689,270, for the first year of the second year of the second year of the second year of the second year of the second year of the second year of the second year of the second year of the 4 year of the 5 year 4 year 5 year 10.

arrow