(영문) 수원지방법원안양지원 2013.07.12 2012가합6832
대여이자금
Text

1. The plaintiff, the defendant school foundation A, and C are jointly and severally 514,786,456 won, and the defendant foundation B and C are jointly and severally 63.

Reasons

1. Facts of recognition;

A. The Plaintiff is a company that aims to (i) the relationship between the parties, (ii) the civil construction business, etc.

D. The Defendant Educational Foundation A (hereinafter referred to as “A”) is an educational foundation for senior general education (D secondary schools, E high schools, F junior colleges, G University), and the Defendant Social Welfare Foundation B (hereinafter referred to as “B”) is a social welfare foundation for senior citizens’ medical care facilities, etc.; Defendant C was the chief director of Defendant A, the president of Defendant B.

B. (i) On October 10, 2002, the Plaintiff entered into a contract with Defendant A (a contractor under the contract refers to “F University President I” but the contractor is not in dispute between the parties) and the contractor for the construction work that was newly built on the ground of 28 lots of land (II) from the J of the Government-Sin Government-si, J and the J of the Government-Sin Government-si, and the F University Gangwon-dong (II), with the construction cost of KRW 10,802,00,000 (including additional tax and the increase in the construction cost after the increase), and completed the said construction work (hereinafter “the first contract”).

However, Defendant A did not pay to the Plaintiff KRW 1,273,300,000 out of the construction cost under the said contract.

on September 22, 2000, the Plaintiff entered into a contract with Defendant A, B, Dongcheon-si, and six parcels of land G University construction work (including additional tax) with the construction cost of KRW 4,132,75,00 (hereinafter “second contract”). The Plaintiff completed the said construction work.

However, Defendant A paid to the Plaintiff KRW 1,770,000,000 out of the construction cost under the said contract.

On December 10, 2002, the Plaintiff entered into a contract with Defendant B on December 10, 2002 with the construction cost of KRW 1,892,00,000 (including additional tax, and the construction cost was finally changed to KRW 2 billion) (hereinafter “third contract”). The Plaintiff completed the said construction work.

However, Defendant B did not pay to the Plaintiff KRW 300,786,000 out of the construction cost under the said contract.

(c)each loan for consumption.