(영문) 서울고등법원 2016.11.22 2016나2016762
손해배상(기)
Text

1. The part of the judgment of the court of first instance against the defendants which exceeds the money ordered to be paid below.

Reasons

1. Basic facts

A. Status 1 of the parties to the case

1) Of the “construction of the 1-2 Section No. 1-2 Section Round and other construction works of the Seoul High-speed Speed,” which connects water and two parallels from water and two parallels, one tunnel(s) is the instant tunnel.

(2) The Co-Defendant Escopic Construction Corporation of the first instance trial (hereinafter “Espopic Construction”) is a company that executes a project to create the housing zone of the case of the case of the housing zone of the case of the case of the case of the housing zone of the case of the case of the housing zone of the case of the case of the building site of the case of the case of the building site of the case of the building site of the case of the building site of the case of the case of the building site of the case of the building site of the case of the case of the building site of the case of the building site of the case of the building site of the case of the building site of the case of the building site of the case from Espopic Construction on December 1, 2011 after purchasing the housing site of the case from Espopic Construction on December 1, 2011 and constructing the housing site of the case of the building site of the case of the building site of the case of the building site of the case from Espopic Construction to December 27, 20120

Meanwhile, Nonparty Samsung C&T Co., Ltd (hereinafter “T&T”) is a construction company that started the construction work of an apartment from April 9, 2012, when it receives a construction contract for constructing a celebb area 3 apartment complex in the instant housing zone, which was created as a housing site from the first patrolman S&A to the instant housing zone.

B. Section 1-2 of the Seoul Metropolitan Area High-speed Railroad, which the Plaintiff performed on the instant construction site and tunnel structure, is the instant housing zone where E.S. construction was conducted through a valley in the south-east direction from the site of the Suwon High-speed Railroad Construction site, as seen in the attached drawing, and the Defendant New-speed Construction was created.

arrow