(영문) 광주지방법원 2016.06.15 2015가단532318
구상금
Text

1. The Defendant: 5% per annum from July 29, 2014 to June 15, 2016, and June 16, 2016, to the Plaintiff.

Reasons

1. Basic facts

A. The Plaintiff is an insurance company that entered into a comprehensive insurance contract for Lecar Business Motor Vehicles with the insurance period from November 20, 2013 to November 20, 2014 with respect to B and CTrac Freight (hereinafter “Plaintiff”), and the Defendant operates a business entity that carries out painting and painting construction with the trade name “D.”

B. The Defendant on April 7, 2014 (hereinafter “E”) is the E Co., Ltd. (hereinafter “E”).

From the point of view, the Cr.m., F. F., the Cr. C., the C.T. 500 to 600 meters road and the C.C. bus stop (hereinafter referred to as “instant basic construction”).

2) On April 8, 2014, after being awarded a contract, G, H, etc., a staff member of D, carried out the said construction work together with G, H, etc. . 2) After the E Facility Team I, ① from the E Facility Team I, the page of the road, approximately 130 meters away from the straight line in front of the valley factory, among the basic construction site of this case (hereinafter “instant revision work site”) was demanded to undergo the correction work due to the vehicle having access to the factory, and ② the said basic construction was requested to do the said additional painting work (hereinafter “the instant additional construction”).

Accordingly, H et al. suspended Radar work according to the Defendant’s instruction around April 8, 2014 when performing Radar work to remove the paint at the instant revision work site, and the following day:

4. 9. The instant additional construction project was scheduled to be carried out.

3) However, on April 9, 2014, the Defendant was scheduled to perform the KS or rooftop waterproof construction works located in the Gwangju J district, and thus, the Defendant went to J district without going to work in the said celebric plant for the said rooftop waterproof construction works. The instant additional construction works became in charge of L employees M, who are D employees, H and E, and subordinate companies. 4) When performing various construction works including painting works in the celebric plant, the instant additional construction works fall under E.