logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원성남지원 2015.04.24 2015가합200605
손해배상(기)
Text

1. All of the plaintiffs' claims are dismissed.

2. The costs of lawsuit are assessed against the plaintiffs.

Reasons

1. Basic facts

A. On November 28, 2009, when Plaintiff A was enrolled in D High School jujum, he was selected as a sports specialty student at Korea University operated by the Defendant. On March 2, 2010, when he was enrolled in the said university, on March 16, 2010, Plaintiff A suffered an accident where the left side of the Do, who was born a jumcule from the other players, had a jumbling game at the Jeju-do training site (hereinafter “instant accident”).

B. On March 11, 2010, Plaintiff A was diagnosed as the result of the MRI’s inspection at the medical corporation branch of Sungnam-si medical corporation (hereinafter “this flus Hospital”) and was hospitalized at the above hospital on the 15th day of the same month and conducted the MRI inspection again on the 10th day of the same month, the Plaintiff A was diagnosed as “satisfying ATFL (L) high frequency,” “satisfying satfying satfys at the left side,” “satisfying satfys at the left side,” “sating satfys of sats,” and “satfys at the above hospital on the 17th day of the same month.”

C. On April 14, 2010, Plaintiff A was hospitalized into Seoul National University Hospital and undergone an inspection again, and was diagnosed as “spatisfying sption sption sption sptions on the left side.” On the 15th day of the same month at the above hospital, Plaintiff A received “additional sption sption and screening sptions” on the 22th day of the same month, and hospitalized in the above hospital until the 29th day of the same month.

Then, on June 9, 201, Plaintiff A, B, etc. filed a lawsuit seeking damages against the Medical Center (U.S. District Court 201Gadan25953) on the ground that there was medical malpractice in the first diagnosis and surgery in relation to the instant accident. On August 20, 2012, when the lawsuit was pending, Plaintiff A, B, etc. received the agreed amount of KRW 20 million from the said Foundation, and withdrawn the said lawsuit.

E. On July 6, 2013, Plaintiff A’s inspection results at the main flus hospital on the flusium and first, the brusium and first, the brusium and the crusium damage.

arrow