Text
1. The Defendant (Counterclaim Plaintiff) shall:
A. The plaintiff B, Osan-si, and one parcel of land D Apartment No. 106, 17.
Reasons
1. Facts of recognition;
A. Plaintiff A Co., Ltd. (hereinafter “Plaintiff A”) is a corporation established for the purpose of building construction business, etc., Plaintiff B is the representative director of Plaintiff A, and the Defendant is a corporation established for the purpose of manufacturing/construction business, such as windows, hardwares, etc.
B. On September 14, 2012, Plaintiff A entered into a contract with the Defendant to carry out the said portion of metal, windows, and glass construction (including value-added tax) with respect to the newly constructed construction of the Ftel in Young-gu, Suwon-gu, Suwon-si, the construction of which is being carried out by Plaintiff A, with the terms and conditions that the Defendant would carry out the said portion of metal, windows, and glass construction from March 25, 2012 to March 31, 2013 (hereinafter “instant FM subcontract contract”), and agreed on the following special terms and conditions:
Matters of special agreement
1. The approval of 60 days after the request for the issuance of a letter made once a month;
b. 3. D apartment 106, 1703, 1703, 4. Complex board 4T [75T short heat (tension 1)] factory manufacturing terms; 5. Out of stairs column: Craing system column (including safety turine).
6. On-sites shall proceed simultaneously with internal and external finishings at the site of shortage of air.
b.7. 7. The inclusion of roll-topul net (600 x 1,200 x 248EA, 600 x 1,00 x 1,00 x 148EA). At the time of pressing construction on August 8, 148, AL-BAR is included in the construction of 3 COAT-BAR, including the construction of a white-water part of a single heating unit on September 1, 199, including 10.0 14EA/LVP two construction works for non-power-topululing non-powered exhausters on October 11, 1199; the use of caters pursuant to the decommissioning of both heavy equipment (host and other workshops) on December 12, 198; the fire air operator on November 12, 197 shall submit the work report and include the work report.
Plaintiff
A On September 14, 2012, which was at the time of the contract for the instant F subcontracted construction, between the Defendant and the Defendant, the representative director of the said Plaintiff, and “Nos. 1703, 1703, 17, 1703, 106, 17, and 1703, Osan-si, the representative director of the said Plaintiff.”