(영문) 창원지방법원 밀양지원 2019.05.30 2018고단399
건축법위반등
Text

A defendant shall be punished by imprisonment for not more than four months and by a fine not exceeding 2,00,000 won.

When the defendant does not pay the above fine.

Reasons

Punishment of the crime

Around November 15, 2016, the Defendant filed a construction report (site area: 760 square meters, total floor area: detached houses, total floor area: 96.78 square meters, the number of buildings: 12 square meters, 22 square meters, 7.4 square meters, and 7.4 square meters) with respect to the land located in Gyeong-Gun B (hereinafter “instant land”) at the Gun Office of Gyeonggi-do (hereinafter “instant land”). On November 15, 2016, the Defendant started construction of new housing from October 2017.

1. Any person who violates the Building Act shall report to the competent authority before changing any reported matter, as prescribed by Presidential Decree;

Nevertheless, from October 2017 to January 29, 2018, the Defendant changed the location of the instant house to the southwest of about seven meters, changed from the second floor to the first floor, the height from 7.4m to fivem, and the structure from the wooden Group.

2. Any person who violates the National Land Planning and Utilization Act shall obtain permission to alter the form and quality of land from the competent authority.

Although the Defendant obtained permission to engage in development activities only on the instant land, on October 2017, through January 29, 2018, the Defendant installed 50 meters of 2-2.5 meters of 2-2-2-5 meters of a structure on the instant land, which is a place other than the permitted place (286m2), and created forest products by cutting and raising land E (202m2), D (286m2), F (46m2), and G (12,258m2).

3. Violation of the Mountainous Districts Management Act;

(a) A person who intends to convert a mountainous district without permission shall obtain permission from the Administrator of the Korea Forest Service, etc. according to the classification of the types, areas, etc. of mountainous districts prescribed by Presidential Decree, and the same shall also apply to any change in

Although the Defendant obtained permission to convert a mountainous district only with regard to H land which is an access road to the instant land, the Defendant is permitted from October 2017 to January 29, 2018.

arrow