1. The remainder of the Defendants except for the Plaintiff, Defendant Electric Constructors’ Mutual Aid Association, Defendant Mechanical Equipment Construction Mutual Aid Association, etc.

Reasons

1. Facts of recognition;

A. The party-related plaintiff (the plaintiff was merged with the Korea National Housing Corporation before the merger, the Korea Land Corporation, October 1, 2009, and the plaintiff was the plaintiff; hereinafter referred to as the "the plaintiff") is a business operator who constructed and sold an apartment complex of the 3 complex complex located in the 289 Sincheon-gu, Seocheon-gu (hereinafter referred to as the "the apartment complex of this case") and the defendants are the contractors or guarantors who entered into a construction contract and joint and several surety contract for the construction of the apartment of this case from 2004 to 205, or issued a warranty bond for the relevant construction type.

The defendant is also indicated in the title section column in designating the defendant for the purpose of toxicity not more than construction, machinery, and civil engineering (hereinafter referred to as "construction, etc.") as a guarantor for the issuance of a warranty bond, which is a joint contractor, a joint contractor, a joint contractor, and a joint contractor of a type of work under the title section in accordance with the party list by type of work.

Defendant 2. Defendant 3 Construction Mutual Aid Association (2) Defendant 4. KWM industrial technology, Defendant 5. Kayang Electric Construction Mutual Aid Association (3) Defendant 5. The Electric Construction Mutual Aid Association (fire fighting among the electric types; hereinafter “fire fighting”) Defendant 7. The Electric Construction Mutual Aid Association (hereinafter “Defendant 8. The Electric Construction Mutual Aid Association”) Defendant 4. Telecommunications Co., Ltd., Defendant 10. 11. Information and Communication Mutual Aid Association of Defendant 10. 5. The Landscaping Industry Co., Ltd., Defendant 3.

B. (1) Defendant 3. The Construction Mutual Aid Association issued the following guarantee certificates concerning the construction completion construction as well as the repair of defects in the year from 1 to 10 years of construction as follows: (1) the construction completion construction as well as the construction as a joint construction as Defendant 1; (2) the construction completion construction as well as the construction as a joint construction as follows.

(2) The electrical construction mutual aid association of Defendant 7. The electrical construction mutual aid association of Defendant 4. KrwM industrial technology and Defendant 5. Drws co-construction.