logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 광주지방법원 2018.05.09 2017가단522582
기타(금전)
Text

1. Attached Table 2 of the Enforcement Decree of the Pension for Private School Teachers and Staff Act, which occurred to the Plaintiff on September 19, 2016.

Reasons

1. Basic facts

A. On April 11, 2013, the Plaintiff was receiving a diagnosis on the confirmation of tuberculosis vertebrate infection from the said movable hospital, while working as a nurse at the Master University Hospital located in Jung-gu, Daegu, Daegu, and experienced marine symptoms, such as continuous low-income forests and pains.

B. The Plaintiff, upon the aggravation of the Habama’s declisis, took part in six parts of the Habaum pressure and chestbrate vertebrate in the said movable hospital as the Habama was damaged due to the occurrence of tuberculosis farming during the anti- tuberculosis treatment on May 10, 2013.

On June 8, 2013, the Plaintiff received at Samsung Seoul Hospital located in Samsungnam University located in Gangnam-gu, Seoul, Seoul, the 81th day of Jun. 8, 2013, the following re-afford vertection and new sacratization and agricultural sacratization and the next

C. On August 31, 2016, the Plaintiff retired from the said movable hospital. On September 19, 2016, the Plaintiff was diagnosed as having been 35% of the Plaintiff’s loss rate of labor ability, and was diagnosed as having been 5 Embrates by fusioning the 5madi, and the Plaintiff was restricted in spine movement. The Plaintiff was able to have limited pedestrians due to the empic damage, but only the limited pedestrian was made available, and accordingly, the Plaintiff’s loss rate of labor ability constitutes 35%.

Accordingly, the Plaintiff claimed a disability pension against the Defendant, and the Defendant determined that it falls under class 7 of class 11 of the disability grade, and paid the corresponding disability pension. D.

On January 4, 2017, the Plaintiff was re-exploited by Samsung Seoul Hospital B, and the Plaintiff was under physical disability at least 50% of the plebathic movement by performing plebathic febrate 6 parts of the plebathic body, and the mathic febathic febathic febathic febathic febathic febathic febathic feb

On January 19, 2017, the Plaintiff was inspected by the Macheon-gu Seoul Hospital on January 19, 2017 for the assessment of post-grade disability, and C with 1/2 of 1,000 Mancheon-gu Seoul Hospital C with physical disability in spine.

arrow