(영문) 서울중앙지방법원 2016.01.20 2014가합522185
공사대금
Text

1. The Defendant’s KRW 75,477,01 and its related KRW 5% per annum from March 11, 2014 to January 20, 2016 to the Plaintiff.

Reasons

1. Basic facts

A. On July 11, 2013, the Defendant: (a) leased 110.91 square meters on the ground and 74.25 square meters on the second floor underground of the steel structure in Mapo-gu Seoul, Seoul (hereinafter “instant building”); and (b) decided to carry out remodeling and interior works on leased 100,000,000, monthly rent of KRW 6,000,000 (excluding value-added tax) for the purpose of selling and distributing musical instruments and sound equipment; and (c) for the purpose of using them as exhibition rooms; and (d) leased 10,000,000,000 square meters on the building on the second floor underground of the steel structure in the steel structure in Mapo-gu, Seoul (hereinafter “instant building”).

B. On August 13, 2013, the Defendant entered into a construction contract with respect to the construction of a parking lot after changing the structure related to the leased part among the Plaintiff and the instant building, removing the interior, removing the sn beam beam reinforcement works, and removing external gardens (hereinafter “renovation construction works”), with respect to the construction of a parking lot from August 10, 2013 to September 20, 2013, and with respect to the construction work cost of KRW 45,00,000 (excluding value-added tax), on the condition that the construction cost is KRW 45,00,000 (excluding value-added tax), and on the one-lane, the construction contract was concluded with respect to the construction work that receives KRW 22,50,00,000 on September 3, 2013 and KRW 9,000 on September 20, 2013 (hereinafter “construction contract”).

C. As of August 16, 2013, the Defendant entered into a construction contract with the Plaintiff and the Plaintiff for interior interior interior interior interior interior interior interior interior interior interior interior interior interior interior interior interior interior interior interior interior interior interior interior interior interior works, etc. (hereinafter “the instant construction works,” including the foregoing construction works, with the construction period from August 16, 2013 to November 20, 2013; the construction cost shall be KRW 305,00,000 (excluding value-added tax); and the construction cost shall be KRW 91,50,000 on October 15, 2013; two-lanes and two-lanes and KRW 152,50,000 on October 23, 2013; and two-lanes and three-lanes and one-lane 61,000 on November 20, 2013 (hereinafter “the instant construction contract”) and agreed to complete the construction contract as “the instant construction project”).

After that, the defendant is not within the scope of the original contract with the plaintiff.