logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대구지방법원 경주지원 2018.11.13 2017가단12618
손해배상(기)
Text

1. Defendant B’s KRW 53,423,100 as well as 5% per annum from August 12, 2017 to November 13, 2018.

Reasons

1. The following facts may be found either in dispute between the parties or in full view of the respective descriptions set forth in Gap evidence Nos. 1, 2, 3, 4, 5, and Eul evidence No. 1 (including paper numbers) and the whole purport of the pleadings:

On June 8, 2009, the Plaintiff concluded a contract with Defendant B for a new construction work of the second-story detached house (hereinafter referred to as “instant house”) on the ground of Samsung-si D for the contract period of KRW 161,30,000 and the construction period from June 6, 2009 to November 5, 2009.

In addition, the Plaintiff entered into a design and supervision contract with Defendant C Co., Ltd. (hereinafter “Defendant Co., Ltd”).

B. Around that time, Defendant B commenced the construction of the instant housing, and the instant housing was completed on January 14, 2010.

C. On the first floor work room among the instant housing, yellow walls were built.

(hereinafter referred to as the “instant construction”) d.

On December 6, 2010, the Plaintiff demanded Defendant B, Defendant Company, and E to repair defects, such as the destruction of water power plants, water leakage, short lines, water leakage, hot water water supply, collapse of outer walls, hold-out repair, floor painting damage, malodor, etc. of the instant housing.

In addition, even around December 26, 2011, the Plaintiff claimed the repair of the housing of this case and the compensation for damages to Defendant Company and E.

E. However, around 11:00 on February 23, 2015, an accident occurred in which household appliances, household goods, etc. were buried in the work room due to the collapse of the soil walls of the work room among the first floor of the instant housing.

(hereinafter “the instant accident”). The main cause of the instant accident was to construct a yellow soil wall without support and connection file, without considering the contactability of yellow dust.

F. In addition to the above defects of sulfur walls, water leakages due to the cracks of the second floor structure in the instant housing, water leakages due to water leakages due to the cracks of the second floor floor of the balcony and the water leakages due to waterproof and construction of the slabs with the roof openings, wood druptures, seals cracks around the openings of external concrete walls, construction studs, and the finishings of the first floor.

arrow