Text
1. The Plaintiff:
A. The Defendant Hyundai Savings Bank, and the Hoho Industrial Development Co., Ltd. are 491,69,239 won and their importance.
Reasons
1. Basic facts
A. The plaintiff is a party in the position of the plaintiff 1) A apartment (3 Dong-dong 429 households, hereinafter "the apartment of this case") located in the Gyeongdong-gun B of the Gyeongbuk-gu.
(2) For the management of the apartment complex, the Defendant Hyundai Savings Bank, and the Hoho Industrial Development are the project proprietor that constructed and sold the apartment complex of this case, and the Hoho Construction Co., Ltd. (hereinafter referred to as the “Shoho Lake Construction”) is the contractor that performed the said construction by being awarded a contract for the instant apartment construction from the Defendant Hyundai Savings Bank, the Hoho Industrial Development, and the Hoho Industrial Development.
3) On June 23, 2008, Defendant Hyundai Savings Bank, Hoho Industrial Development, and Hoho Construction entered into a business agreement with the Defendant Hyundai Savings Bank to pay the acquisition price of the entire place of business (the project site, all of the ground buildings, business rights, etc.) to the Defendant Hyundai Savings Bank on the site owned by the Defendant Hyundai Savings Bank by designating the Defendant Hoho Industrial Development as a joint project proprietor, and as a construction contractor, to complete the construction of the instant apartment on the site owned by the Defendant Hyundai Savings Bank. (B) On December 18, 2009, the Defendant Hyundai Savings Bank, Hoho Industrial Development Co., Ltd. entered into a contract with the Defendant Construction Mutual Aid Association on the defect liability guarantee (hereinafter “instant contract”).
The Plaintiff, from November 27, 2009 to November 26, 2019, 92,019,074 D', floor, roof, reinforced concrete 92,019,074 E from November 27, 2009 to November 26, 2014, and roof and waterproof construction works, from November 27, 2009 to November 26, 2013, including designation of 92,019,074,074, and the basis for the designation of 27, 2009 to November 26, 2013, from the autonomous management organization, from November 27, 2009 to November 26, 2012 to November 26, 2012;