logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 광주지방법원 2017.09.13 2016가단505054
부당이득금
Text

1. Aboard (D) connecting each point of the Plaintiff’s separate drawings to the Defendants, the Plaintiff’s separate specifications, the other, the other, the vehicle, and the car.

Reasons

1. Facts of recognition;

A. The Defendants, as married couple, indicate the annexed drawings of 86.46 square meters of buildings F located in Gwangju Northern-gu.

(a).

(c).

A. The number of people who rent and use approximately 60 square meters inboard (A), which connects each point of each point (hereinafter referred to as “instant building”).

B. The Plaintiffs are those who have been on the street before the instant building, and the Plaintiff A from February 201 to February 201 indicated the annexed drawing.

(k) typists;

(j)in the delivery of the part of the ship connecting each point ofk., the plaintiff B is marked with the annexed drawings.

(l) g. H.;

(i)on the delivery of a part of the ship (C) that connects each point to each point;

Plaintiff

C around November 7, 2014, after taking over the part in the ship indicated in the annexed Form (C) possessed by the Plaintiff B, the Plaintiff occupied the part in the ship, and then the Plaintiff is on the street in the area including half of the delivery of the part in the ship indicated in the annexed Form (d).

C. The Defendants received the following money in return for allowing the Plaintiffs to use the parts above (d) and (c) in front of the instant building.

1) From February 201 to January 201, 2012, Plaintiff A and B received 2.5 million won each of the annual aggregate of KRW 2.6 million from February 2012 to January 201, ② received 3 million each of the annual aggregate of KRW 1.6 million from February 2012 to January 2013; ③ received KRW 3.6 million each of KRW 3.6 million for one year from February 2013 to January 2014; ④ from February 2014 to February 1, 2016, Plaintiff B received KRW 3.6 million each of KRW 3.6 million each of KRW 1.6 million from Plaintiff A, with KRW 3.6 million total of KRW 1.6 million ( KRW 2.6 million total of KRW 3.6 million) from Plaintiff A, with KRW 3.6 million total of KRW 3 million and KRW 1.66 million ( KRW 3.66 million total of KRW 3.66 million each month from Plaintiff

arrow