logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 부산지방법원동부지원 2017.06.15 2016가단204389
손해배상(산)
Text

1. The Defendants’ respective Plaintiff KRW 36,368,00 and 5% per annum from June 14, 2014 to June 15, 2017.

Reasons

1. Basic facts

A. Defendant Sjin Heavy Industries Co., Ltd. (hereinafter “Defendant Sjin Heavy Industries”) awarded a contract for the installation of blocks to the Defendant Il Shipbuilding Co., Ltd. (hereinafter “Defendant Il Shipbuilding”) and the Defendant Il Shipbuilding subcontracted Defendant B with the work of “the installation and decommissioning of Deck House and Blocks, Ring Blocks, and Slocks.”

The block installation work is to install a structure in a place where a distribution is made in advance to create a boat.

B. On June 14, 2014, the Plaintiff: (a) fell from the “C” workers of Defendant B’s “C; (b) on the site of the installation of the Defendant Saein Heavy Industries D block in Ulsan-gun, Ulsan-si, Ulsan-do, U.S., U.S., Ulsan-do, in order to fall from the height of 4 meters to the passage of 5 meters high and above the passage of 5 meters while the Plaintiff was conducting the construction of a bridge to move to the passage of the passage of 5 meters.

(hereinafter referred to as “instant accident”). C.

In the instant accident, the Plaintiff suffered injuries, such as the closed alleys of both sides, and received hospitalization and outpatient treatment by March 25, 2015 after undergoing surgery on June 17, 2016.

The Plaintiff received temporary layoff benefits from the Korea Workers' Compensation and Welfare Service 22,952,880 won, medical care benefits 11,169,680 won, and disability benefits 17,780,300 won.

E. The Plaintiff’s treatment was completed, and 12% of the date of the instant accident to November 7, 2019 from the date of the instant accident, due to the permanent disability of 16% and the left-hand satisfaction of 16% as an outdoor worker’s alley (A-1-b) to the right-side alley (A-1-b).

[Ground of recognition] Unsatisfy, each entry of Gap1 to 3 evidence (including paper numbers), the result of the appraisal commission to appraiser E, the purport of the whole pleadings

2. The parties' assertion

A. The plaintiff's assertion 1 did not properly fix the bridge while he was on the bridge, and the defendant Sejong Heavy Industries, the owner of the rock plant in which the accident in this case occurred, is the bridge.

arrow