Text
1. The plaintiff's claim is dismissed.
2. The costs of lawsuit shall be borne by the Plaintiff.
Reasons
1. Basic facts
A. On September 2, 1910, the land survey division prepared during the Japanese occupation period of B, etc., the land survey division prepared in the Japanese occupation period of B, as to the land survey division prepared on September 2, 1910 (hereinafter referred to as the “instant assessment land”). B (D) located in the Gyeonggi-do Si interest-gun C, Si interest-gun, Gyeonggi-do (hereinafter referred to as the “instant assessment land”).
2) On September 6, 1920, the registration of ownership (certification) in the name of F was completed as of November 12, 1912 on the closed register for the land of this case in which the entry in the register of land certificates was omitted on September 21, 1918, and thereafter the registration of ownership transfer in G name was completed on February 6, 1920.
3) Meanwhile, on February 15, 1935, the assessment land of this case was divided into 115 square meters, 115 square meters, 1,594 square meters, and 118 square meters, respectively, and on July 11, 1935, the registration of ownership transfer was completed under the name of Chosun general, and on March 8, 1939, the registration register was all closed due to the fact that the river site was made under the Joseon River Order. (B) After the 115 square meters, 115 square meters, 1,594 square meters, 118 square meters, J Sejong land, 1975, and 118 square meters, 30 square meters, 30 square meters, and 92 square meters, 30 square meters, and 98 square meters, 30 square meters, and 198 square meters of land in the form of a river.
2) In the foregoing light name, K bank 380 square meters was combined on July 10, 2001, and N bank 2,901 square meters. The said N land was combined on November 30, 201 and combined on November 30, 2010, and the part corresponding to K bank 8,110 square meters (the part corresponding to K bank 380 square meters prior to the merger) is deemed to be “the instant one land.”
In the meantime, the area of 5,269 square meters L river was changed on January 1, 1987, and the administrative district was changed on January 1, 1987, and the area of 5,269 square meters (hereinafter “instant 2 land”).
2) A) A. M bank 390 square meters are as follows: Q control room 390 square meters (hereinafter “instant three land”).
A) The entire area of each land of this case (hereinafter “the entire area of land”). The entire area of each land of this case (380 - 380 - the area of land of this case) is located.