(영문) 서울중앙지방법원 2018.01.16 2016가단5199846
구상금
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. On January 2013, A entered into a lease contract and fire insurance contract with B, around January 2013, A operated a golf range with the trade name of “E” among the buildings with the 1st and third floors underground in the Gu-Si of Gu-U.S., Da-si, the 1st and third floors above the ground located in C and B, and the 3rd floors above the ground. Of the leased objects of this case, the 1st floor above the ground level (area 132.23 square meters below) is divided into a string practice room (on-site), a string analysis room (on-site), and is divided into a string, toilet, and warehouse. A warehouse is divided into a string analysis room into a string, a separate partition of the string and timber, and the inside of the Internet (hereinafter referred to as “instant heavy meters”).

(2) The Plaintiff was an insurer who entered into an insurance contract with A, “1204.4 as carbon without dividend Samsung Fire Property Insurance,” with the following contents. On the underground floor of the instant insurance site, computer equipment, film equipment, golf, furniture, household products, etc. necessary for golf practice and correctional education, and household fixtures were diversifiedly accepted.

Insurance types: Fire insurance policyholders and the insured: The insurance period of E (Change of the location of the object on January 15, 2013): From July 23, 2012 to July 23, 2017 (five years): 1 billion won per unit of the liability to compensate for the owner of the facilities, 130 million won per unit of the liability to compensate for the lessee (fire) and the amount of insurance coverage: Facilities and fixtures, 10 million won per unit of the liability to compensate for the damages: 10 million won: 100 million won;

B. On August 2, 2013, at the request of A on August 2, 2013, the Defendant installed, respectively, the LET indoor type (20M relays) manufactured by KON-Link Co., Ltd. on the inner wall of the warehouse of the 1st underground floor of the instant case by NON-Linking Co., Ltd. and by MTE indoor type (20M relays).

The confirmation letter of installation of each of the heavy meters submitted by A to the defendant company at the time is the KT assets, and the main relay is the internal test change and the director.

arrow