Text
Defendant shall be punished by a fine of 8.5 million won.
If the defendant does not pay the above fine, 50,000 won.
Reasons
Punishment of the crime
The Defendant is the owner and owner of the building of the 4th floor B in Yeongdeungpo-gu, Gwangju-gu, and the Defendant, despite obtaining permission from the competent authorities in order to repair the building on a large scale, built the building on May 19, 2012 in a way of piling up the boundary walls on each of the 2 to 4th floor of the building without obtaining permission from the competent authorities on May 19, 2012, and built the building on a large scale to increase the number of households with the 4th floor and the 4th floor to 10 households with the total number of 10 households with the 2nd household (the 367.06 square meters in size).
Accordingly, the defendant made a large-scale repair of a building without permission.
Summary of Evidence
1. Statement by the defendant in court;
1. Written accusation, on-site investigation, and on-site photographs of C preparation;
1. Application of Acts and subordinate statutes demanding corrective measures against violating buildings;
1. Article 108 (1) and Article 11 (1) of the Building Act applicable to criminal facts, Articles 108 (1) and 11 (1) of the Act on the Selection of
1. Articles 70 and 69 (2) of the Criminal Act for the detention of a workhouse;
1. Article 334 (1) of the Criminal Procedure Act of the provisional payment order;