(영문) 서울중앙지방법원 2019.01.15 2016가단5235384
구상금
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Facts of recognition;

A. A. Around November 2015, the Plaintiff entered into an insurance contract with the Dispute Resolution Co., Ltd. (hereinafter referred to as the “C”) with the content that guarantees property risks to the machinery, equipment, etc., including the building of each factory (a Dong factory 2,016 square meters, a multi-dong factory 832 square meters, a multi-dong office), and a screen, with the term “A” (hereinafter referred to as “Ganpo-si factory”) and the term of insurance from July 10, 2015 to July 10, 2016.

On September 1, 2014, between C and C, the Defendant entered into a contract to manufacture 350 CM 1,50 CM 150 CM 1,000,000 won in total (excluding value added tax) and supply C factory with scrap 350 CM 1,50,000,000 won in total. From around 2015, the Defendant supplied C Kimpo Factory with each of the above scraps.

B. On March 26, 2016, at around 06:30, a fire occurred in the above 350 CM screen screen (hereinafter “instant screen”) installed on the two outer floors between the building of a factory operated or operated by C, and the employees of C discovered that the fire was caused by the 119 report, but the fire was destroyed by the outer wall panel, etc. of the factory building operated or operated by B, and the instant screen screen was lost by the external wall panel, etc. of the instant fire.

(hereinafter “instant fire”). C.

1) The Plaintiff stated that C’s content of the damage assessment report prepared by the damage assessment business entity that the Plaintiff requested, and C’s factory set up an industrial Pampling, supplied balle oil as fuel to the power plant, and completed its business at least 18:00 prior to the date of the accident. F(the team leader) discovered a fire that the Plaintiff was locked in the resting room in the factory. The damage assessment business entity stated that the damage assessment business entity is presumed to have been launched and burned due to the fire caused by the sturgation of the exhaustr equipment, but it seems that the fire was not limited to the source of the fire.2) The Kimpo Police Station.

arrow