(영문) 창원지방법원 2015.11.25 2015고단1510
산업입지및개발에관한법률위반
Text

Defendants are innocent.

Reasons

1. The summary of the facts charged is that Defendant A is the representative director B, and Defendant B is an enterprise that manufactures and sells parts of motor vehicles and transport equipment.

1. On July 14, 201, the Defendant: (a) was designated as an industrial complex development project implementer to develop an industrial site in which electric vehicle operation parts are specialized; and (b) was granted authorization of completion on December 12, 2013 by the Defendant.

Where it is intended to dispose of an industrial site for which the above authorization of completion has been obtained, it may be disposed of before or after the report of completion of factory establishment, etc.

Nevertheless, on October 16, 2014, the Defendant sold the industrial site to E without reporting the completion of the establishment of the industrial site.

2. Defendant B Co., Ltd. committed the same act of violation as set forth in paragraph (1) above with respect to the business of Defendant A, the representative director of Defendant Company, at the same time and place as set forth in paragraph (1) above.

Defendant A is the representative director of the Company B, and Defendant B is the company that manufactures and sells parts of cars and transport equipment.

Where a project operator intends to dispose of an industrial site for which authorization of completion has been obtained, he/she may dispose of it before or after the reporting of completion of factory establishment, etc., within a period prescribed by Presidential Decree (five years), and where a project operator intends to dispose of it before the above period (five

1. On July 14, 201, Defendant A was designated as an industrial complex development project implementer to develop an industrial site where electric vehicle parts are specialized, and was authorized on December 12, 2013, with respect to the area of 149,400 square meters in Kimhae-si, including Kimhae-si, F and G, and H on July 14, 201.

Nevertheless, on April 28, 2015, the Defendant did not report the completion of the establishment of a factory, and on April 28, 2015, sold the above F 3,306 square meters to (ju) J. 1.7 billion won.