logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원성남지원 2019.04.23 2018가단236936
가스관 시설권 확인
Text

1. The Defendants are linked in sequence to each point of the following: (i) the indication of the attached drawing among the area of H 43 square meters in Gwangju-si, Gwangju-si, (ii), (v), and (vi).

Reasons

1. The description of the grounds for the claim shall be as specified in the attached Form;

2. Applicable provisions;

(a) Defendant E: Articles 208(3)2 and 150(3) (a) of the Civil Procedure Act

B. The remaining Defendants: Article 208(3)3 of the Civil Procedure Act (amended by public notice)

arrow