logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울행정법원 2020.04.28 2019구합79374
입찰참가자격제한처분취소
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

. The successful bidder shall be responsible for any defect, compensation, and accidents that occur due to the failure;

12. Other matters.

A. This bid is conducted only by the electronic bid on the Korea Asset Management Corporation’s “Ondod”. Thus, all matters concerning this tender, such as the statutes and conditions of bidding, the bidding notice, and the rules on participation in the bidding on the Internet, must be sufficiently informed and participated in the bidding before the bidding, and the liability which is not familiar with this shall be borne by the participants

B. Since goods are sold on the present condition, the bidder must attend the site site conference to confirm the status of goods, etc. and respond to the bidding time.

(c) cannot raise an objection on the responsibility of the successful bidder with respect to all matters, such as loss, accident, and condition of the goods arising from the time of taking over or taking over the goods.

It is necessary to confirm the list of the additional items other than the On-the-spot information of the On-Site, and directly confirm the objects at the On-Site Committee.

* On March 15, 2019, Party B published the instant bid on the “On the Round site” (hereinafter referred to as the “instant bidding notice”) “On March 15, 2019, Party B published the instant bid on the Round website” website, a national integrated electronic procurement system, for the following reasons: (a) distinguish the current status of goods from name; (b) distinguish the names of goods; (c) quantity of sales; (d) non-high sales store equipment; (e) tickets and vending machines; (e) 9,000 ticket issuance machines; and (e) 4 (1) 2.

The main parts of this case are as follows. (2) However, the agency B did not hold 9,00 "E" ticket issuance machines, unlike the current status of the goods in the notice of this case, and instead held 18,000 diskettes issuance machines, composed of 2 type, 1 type, and 1 type 1 type of device.

3. On March 25, 2019, the Plaintiff attended the site site conference of B agency located in a warehouse located in Cheongju-si, and goods subject to sale under the instant bidding.

arrow