(영문) 인천지방법원 2020.10.14 2019가단254252
약정금
Text

1. The defendant,

A. 29,400,000 won for Plaintiff A, 35,200,000 won for Plaintiff B, and 16,100,000 won for Plaintiff C and each of the above.

Reasons

Facts of recognition

A. Plaintiff A owns the Bupyeong-gu Incheon Bupyeong-gu E building, Plaintiff B’s F building in Bupyeong-gu Incheon, and Plaintiff C’s G building in Bupyeong-gu Incheon Bupyeong-gu.

(hereinafter collectively referred to as the “instant house.” The Defendant is co-owners who own 30/100 shares of the H Condominium in Bupyeong-gu Incheon Metropolitan City (hereinafter referred to as the “instant new building”).

B. The instant housing was partially destroyed due to the destruction of the foundation of the instant new building, and the Defendant requested a corporation I to conduct a thorough safety inspection on the instant housing, following the destruction of the instant housing and the specifications and estimates of the repair and reinforcement construction of the instant housing.

1) The Plaintiff’s housing was generated 1, room 2, and room 3 floor slabs with repair cost of KRW 29,400,000. The water leakage was generated in the main window frame, and the rupture and ruptures were destroyed in the strings of toilets, boiler rooms, red walls, and floor slabs, and part of the windows and ruptures were damaged due to the bottom subsidence, and there was a large number of ruptures on the inner and external structure (in particular, it is necessary to rebuild the inner structure after removal). 2) The Plaintiff’s housing was owned by the Plaintiff B, 35,200,00 won in repair cost, and the rupture and ruptures were generated in the cell room and main floor slab, and the rupture and rupture were removed from the outer bottom of the boiler, in particular, the heat and ruptures were destroyed by the removal of the inner and external structure of the rupture and rupture.

3) The Plaintiff C-owned housing consists of KRW 16,100,000 of repair cost, and the rupture and ruptures are generated in the dwelling room, room 1 and room 3 floor slab bars (e.g., the subsidences of the boiler room, the rupture and the ruptures of the boiler room, and the ruptures are damaged due to the bottom subsidence.