(영문) 대구지방법원서부지원 2017.11.15 2014가단19954
손해배상(산)
Text

1. The Defendant: (a) KRW 22,146,508, Plaintiff B, and Plaintiff C respectively; and (b) each of them on June 13, 2013.

Reasons

1. Facts of recognition;

A. The relationship between the parties 1) On June 11, 2013, Plaintiff A (E) was an employee upon receipt of a request from the Defendant from the Defendant to engage in assembly works related to the sn beam beam line in the construction site of the warehouse located in YY-gun, Chungcheongnam-gun. Plaintiff B and Plaintiff C are the parents of Plaintiff A, the Defendant is a parent of Plaintiff A, the Defendant engaged in a mutual housing construction business, etc., and the supply and demand of the above warehouse construction work. (2) The content of the construction performed by the Defendant upon receipt of a contract is a prefabricated-type construction of 2 logistics warehouses, with 14 meters wide and 35 meters long of 35 meters long of H beam columns installed at two lines with the h beam beam columns (roline) connected with the upper part of the H beam beam columns in h beam-gun-gun, and was assembled with the roof structure and completed a panel covering the roof and the wall.

B. On June 12, 2013, the Plaintiff carried out the process of assembling the beam beam at a sn beam line at the top of the h beam pole installed in a vertical line at the above construction site in a horizontal manner. At the time, the Plaintiff was expected to use the sn beam pole in the sn beam pole and used it to snife the snife onto the floor during the assembly work (hereinafter “the instant disaster”).

2) At the time of the instant accident scene, the total number of workers, including the Plaintiff, were engaged in the work in accordance with the direction and supervision of H.

The process of assembling the sn beam beam shall be conducted in such a way that one working person opens the sn beam onto the sn beam by using the sn beam when the sn beam was run in the sn beam, and then two workers assemble the sn beam in each hn beam pole using the V.

3 When the 3 workman goes up with the sn beam pole and conducts a V assembly work, he shall use the protruding part of the sn beam beam pole installed vertically in a vertical line, and the plaintiff A at the time of the accident in this case shall 6th beam.