Text
1. The plaintiff's claim is dismissed.
2. The costs of lawsuit shall be borne by the Plaintiff.
Reasons
1. Basic facts
(a) The title of the patented invention 1) invention: C2) filing date/registration date/registration number: Plaintiff 4) claims : 【 Claim 1 】 electric sea in which the target of the former sea smoke and the target of the preceding sea wave are installed inside the accommodation space; Posing a sound theater fixed inside theme formed on the part of the day of the preceding sea wave; Posplates installed on the part of the base of the preceding sea smoke; Masplates installed at the above Mosp fixed at the above Mosp fixed at the above Mosp, which fix the sound theater; Masplates installed at the above Mosp fixed at the above Mosp fixed at the above Mosp; 2) right holder shall be entitled to the previous sea gas, including the direction of stopping the Mosp (-) to the mosp of the preceding sea gas, which shall be in conformity with the direction of arrangement in the part of the upper sea gas to be formed in the part of the upper sea gas.
1) 【Request 2, 3, 5, 6】 Claim 4 【Request 4’s main technical field, background technology, and solution 5’s main technical field - As shown in the previous technology 1 Do 100, the electric sea steering system according to the previous technology is installed inside the electric sea (112) where the electric sea steering system in accordance with the previous technology is accepted (112) and the electric sea steering system (10) is installed, and the electric sea steering system in which the electric sea steering system in accordance with the previous technology is installed (110) is installed in the mast (120) part (120) of the previous sea steering system (120) and then installed multiple extreme fixed strings (130) with the same multiple strings (120) as the previous strings (120).
In addition, it is between different basic frameworks.