(영문) 서울고등법원 (춘천) 2021.01.20 2020나754
손해배상(기)
Text

1. The judgment of the first instance is modified as follows.

A. The Defendant’s KRW 19,317,304 and its related amount on November 2017.

Reasons

1. The reasoning of the judgment of the court of first instance, which cited the relevant part of the judgment of the court of first instance, is the same as the grounds for the judgment of the court of first instance (excluding the part “5. conclusion”) (excluding the part “5. conclusion”) with the exception of supplementing or adding the judgment as set forth in the following 2, thereby citing it as it is in accordance with the main sentence of Article 420 of the Civil Procedure Act.

2. To modify each “this Court” in the amended part as “First Instance.”

2. The 9th line “D” shall be amended to “I”.

under 2. The following shall be added to five subsequent actions:

Article 4(1) of the Construction Contract provides that “A shall prepare a basic design drawing according to the standards for store facilities of E and obtain approval from the Plaintiff, and the Defendant shall perform all construction and work related to the design construction work in good faith, and shall receive work instructions from the Plaintiff and C at least once a week from the Plaintiff and C (Article 3). The construction work shall correspond to design drawings and specifications, and shall be performed under the agreement of the Plaintiff after receiving supervision from C (Article 4(1)), and the construction work specifications presented by the Defendant shall be performed under the agreement of the Plaintiff (Article 4(2)). As to matters not specified in the construction specifications, the Plaintiff, C, and the Defendant shall perform the construction work after mutual consultation (Article 4(2)).

'The results of the inquiries of each fact about appraiser G of this Court' shall be added after 2 years below the 5th day.

6. To substitute the 6th mark with the following table:

The cost of repairing defective defects in the store is high.

1. 83,233 of water leakage in a tent store;

2. The number of 221,967 in a tent for burial;

3. Animals and other equipment; 545,329;

4. The number of walls 2,874,295;

5. Walls pipes 2,241,358

6. External finishing 13,248,789;

7. Electrical construction 1,521,571

8. Removal of signboards or re-installation works 796,662 private stores;

1. External finishing 8,647,089;

2. Electrical construction 1,250,413;

3. On the 6th day of the 5th day below the 5th day below the removal or re-installation of signboards, the 531,108 Gohap 31,961,814 “North Korea point” shall be amended to “North Korea point.”

7 The 7th page "one point", later than "(......).