(영문) 부산지방법원 2013.11.11 2013고정2896
업무방해등
Text

The sentence of punishment against the Defendants shall be suspended.

Reasons

Punishment of the crime

Defendant

A is a Korean Buddhist E Organization F in Busan Northern-gu, which is the owner of the building attached to the above F inspection, and the defendant B is the representative of the above F, and is the spouse of the above A.

Victim H is the owner of the I building in Busan Northern-gu, and the owner of the building who has obtained the building permit to remove the building and build the sub-building.

On February 4, 2013, the Defendants and the victims caused damage to the above G building owned by Defendant A, beyond the bricks of the above G building, and caused disputes between the Defendants and the victims due to their demand for compensation for damages and suspension of construction.

1. Defendant A

A. On February 7, 2013, from around 09:30 to 16:30 on the same day, the Defendant, as a force, interferes with the victim H’s above removal work, the owner of a building, by demanding the suspension of construction due to the above dispute, by failing to sit in the J Pokeer’s diskettes during construction waste collection work.

B. On February 18, 2013, between 08:30 on February 18, 2013 and 12:30 on the same day, inserting them in the construction site of the foregoing paragraph, and inserting them in the above sckeet, which was a construction waste collection work for the same reason, and “it shall not see any construction work, die,” and, by force, interfere with the removal work of the victim H, the owner of the building;

C. On February 26, 2013, from around 09:00 to around 10:30 of the same day, the victim H’s removal work, who is the owner of a building, was obstructed by force, such as holding in the construction site of the above paragraph (a) and taking a bath on the above sckeet, which was a construction waste collection work for the same reason.

2. Defendant B

A. On February 13, 2013, from around 08:30 to 12:30 on the same day, the Defendant, for the same reason as that of paragraph (1) at the construction site for the removal of Paragraph (1) to the above A, is a threat of force to prevent the Defendant from sitting up in the boomet during work, and thus, the removal of the Victim H.

arrow