logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대전지방법원 천안지원 2016.05.13 2016고단1
산업안전보건법위반
Text

Defendant

A shall be punished by imprisonment with prison labor for four months.

However, the above sentence shall be executed for a period of one year from the date this judgment became final and conclusive.

Reasons

Punishment of the crime

The Defendant is a personal business owner who actually runs the F in Pacific City, and performs the said construction with 23 full-time workers from March 23, 2015, by being awarded a contract for KRW 1,110,00,000 to “the removal of Irrrrrrrrrrrr (hereinafter “H”) in Y (hereinafter “H”) located in Seo-gu, Seo-gu, Seo-gu, Seoul (hereinafter “H”).

In the course of dismantling a building, etc., a business owner shall conduct a prior investigation into the structure, surrounding conditions, etc. of the dismantled building, etc., and record and keep the result thereof in order to prevent any danger to workers due to defective work methods, etc., and shall prepare a work plan including drawings, equipment, ventilation equipment, fire prevention equipment, etc. in the order of decommissioning, contact methods in the place of business, a disposal plan of dismantled, a work plan for dismantling machinery, apparatus, etc., and a work plan including work plans, etc., in order of dismantling, in consideration of the results of the investigation, and shall have the employees under his/her control conduct work in accordance with the plan by including the appropriate method of dismantling and safety-related matters, such as the installation of a temporary fixed system, etc., after separation from the bed, if there is a concern that workers might suffer from danger due to the excess of the dismantling structure.

Nevertheless, the Defendant, at around 13:06 on May 29, 2015, had the victim J (57 tax) (the victim J (57) of the person who works in F work in the H located in Seo-gu G, Seo-gu, Seocheon-gu, Seocheon-gu, and the prefabricated dismantling work of the victim of the person who works in F work in F, do not prepare in advance a work plan taking into account the structure of the relevant machinery and equipment, the surrounding circumstances, etc. of the relevant machinery and equipment, etc. in advance, and did not prepare a work plan taking into account the results of the prior investigation and investigation. The victim’s size x 2m x 1.8m x 0.5m x weight: 300k g) and cut the electric wires connected to the lower part of the control panel, cut the dive part of the above fish panel with a percentage.

arrow