(영문) 서울중앙지방법원 2019.09.06 2018가단5074705
손해배상(기)
Text

1. The plaintiff's claim is dismissed.

2. The costs of the lawsuit shall be borne by the Plaintiff, including the costs incurred by participation.

Reasons

1. Facts of recognition;

A. On October 2017, the Busan Regional Government Procurement Service, under the Defendant’s control, issued a public notice of the bid for purchase of procurement commodities (goods) with respect to the “C Corporation (Rope Pib and Yangyang-be) total sand contract” (hereinafter “instant bid”) as the Defendant’s Intervenor joining the Defendant.

The name: The quantity of sand (hereinafter referred to as "the sand in this case"): The delivery condition of 4,380 square meters: The estimated price for the difference between the place of delivery and the place of delivery: 197,100,000 won (per additional tax rate): See the standards for inspection; see the detailed matters related to the standards for inspection.

B. On November 28, 2017, after the Plaintiff was determined as the counter-party to the instant construction project (hereinafter “instant construction project”) in response to the instant bid, the Plaintiff entered into a contract for goods to be a procuring entity (hereinafter “instant contract”). On January 31, 2018, the delivery time limit of KRW 176,401,200, the delivery time limit of January 31, 2018: the lower limit of the delivery place, the delivery place: the water ew in the vicinity of the D bathing beach, the inspection institution, and the tallying institution: a procuring entity (hereinafter “instant contract”).

C. Among the purchase specifications for the instant bid and contract (hereinafter “the instant specifications”), the relevant major contents are as follows.

1.1The scope of coverage 1.1 This specifications sets out all the matters concerning the purchase of puls for pulse required for C Works.

2.1Flord sand for two-rounds shall be selected from 2.1 plord sand above current D coast beaches, and its color shall be limited to yellow or white color, and shall be similar to existing sand;

The quality and color of sand put into this construction project shall meet the following conditions:

The content of organic content (%) less than 1.5 square meters less than 0.4-0.6 meters at the average of 0.6m 0.4-0.6m breadth at the central level of at least 2.6m 0.6m, and less than 1.5m organic content (%) below 1.5m less than 0.1-1.2m from 0.2m to 2.2m of quality conditions 2.2.3m, for the purpose of the use of bathing beach water pollution level for the use of bathing beach water 2.2m.