(영문) 창원지방법원진주지원 2014.06.11 2013가합648
손해배상 등
Text

1. The Defendant: 54,055,496 won to the Plaintiff, and 5% per annum from January 23, 2014 to June 11, 2014, and the following.

Reasons

(2) On October 6, 201, the Plaintiff concluded a contract (hereinafter “instant contract”) with the Defendant with the construction cost of KRW 470,000,000 and the construction period from October 6, 201 to February 6, 2012, on the following grounds: (a) the Plaintiff signed a contract with the Defendant for the construction cost of KRW 470,00,000; and (b) the key content thereof are as follows.

Construction period: Construction cost on October 6, 201 to February 6, 2012: 470,000 won [30% at the time of the contract, 20% at the time of the conclusion of the third floor concrete building, 20% at the time of the completion of aggregate construction (the 30% at the time of the contract, and the remainder 30% at the time of the completion of aggregate construction, and 0% at the time of the approval for use of the building]: 0.1% special engineer at the rate of one percent per day after the approval for use of the building: * 20 multi-household housing pool: The dyp of stairs at the end of two stories, and all other materials shall be paid at a higher level.

* The heat between generations shall refer to design drawings, and Twelves shall be fluord with 2 concurrents (it is possible to change).* all materials, such as stone, remote areas and typ, and colors shall be selected by the owner.

* Other: All other costs relating to construction are included in the above contract.

On September 26, 2012, the Plaintiff and the Defendant settled the construction cost in the presence of D, a supervisor for the new construction of the instant building. For this purpose, the main contents of the specifications prepared in advance by the Plaintiff (hereinafter “instant specifications”) are as follows.

The details of calculation (amount omitted): Interest on the construction cost of KRW 106,00,00 for the construction cost of KRW 23,50,000 for the construction cost of KRW 23,50,000 for the construction cost of KRW 106,00 for the construction cost of KRW 23,50,000 for the construction cost: The amount of KRW 995,341 for the construction owner: The amount of KRW 106,690,00 for the construction cost from February 7, 2012 to September 21, 2012 for the construction cost of KRW 106,690 for the construction cost of KRW 24 million: KRW 1.7 million for the construction cost of KRW 6 million: KRW 5 million for the construction cost of KRW 9,500 for the construction cost of KRW 500,000 for the remainder of KRW 9,500 for the construction cost of KRW 1,500 for the construction cost of this case.