logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 의정부지방법원 2016.05.12 2015가합2758
공사대금
Text

1. As to KRW 2,893,896,254 among the Plaintiff and KRW 186,00,000 among the Plaintiff, the Defendant shall start from August 29, 2014 to May 14, 2015.

Reasons

1. Presumed factual basis

A. 1) The Plaintiff is a company established for the purpose of new and renewable energy-related construction works, such as electrical construction, machinery and equipment construction, and solar installation works. 2) The Defendant is a company established for the purpose of solar power plant installation works and power sales business.

B. (1) On March 17, 2014, the Plaintiff entered into the instant contract and the loan agreement, etc. (hereinafter “instant contract”). On the ground, the Plaintiff and the Defendant set up a so-called “so-called “so-called So-called So-called So-called “so-called So-called So-called” solar power plant on the water surface 675 and 7 parcels on the water surface of the Defendant, Ansan-si, Masung-si, Masung-si, Masan-do, 350 and 7 parcels on the ground

The main contents are as follows. The construction cost is as follows. The construction cost: The period for solar power plants 1,860,000,000 won (excluding value-added tax), and the period for solar power plants 1,860,000,000 won (excluding value-added tax): The payment rate for delay on April 1, 2014 after the commencement date of the contract: 30% of the contract price per day: The 30% of the contract price shall be paid within seven days after the conclusion date of the contract, the price for the goods out of the intermediate 60% of the contract price shall be paid according to the performance of inspection for each week, and the remainder shall be paid within seven days after the completion date of the construction inspection; 10% of the contract price shall be paid within seven days after the loan agreement (hereinafter “the loan agreement”). The Plaintiff together with the Defendant (hereinafter “the loan agreement”).

The main contents are as follows:

The loan limit: total amount of 37,200,000,000, the Plaintiff's loan limit of KRW 1,860,000,000 in kind, cash of KRW 1,475,00,000 in total, and KRW 3,335,00,000 in kind, the loan limit of the non-party company is KRW 385,00,000 in kind, annual interest rate of KRW 6% in kind, interest rate of KRW 19% in year shall be calculated from the enforcement date of the first loan.

arrow