Text
[Defendant A] The defendant shall be punished by a fine of five million won.
If the defendant does not pay the above fine, 100,000.
Reasons
Punishment of the crime
Defendant
A around March 1, 2017, A is the representative of "F" who was awarded a subcontract for the tasks of the cable production team and the production team of the cable production team and the production team located in the Gu-U.S., Si-si, for the operation of the cable production team prior to the transmission, the tasks of support for the operation of the transmission part short-term work, QA finished product and the interim inspection.
Defendant
A had an employee under his/her jurisdiction carry out the business of managing and supervising the ultra-high voltage cable forum in the ultra-high voltage cable terminal operation room in the old-si Seoul Special Metropolitan City D Co., Ltd., and therefore, A had an employee under his/her jurisdiction to carry out the business of managing and supervising its employees. As such, A had a duty of care to take necessary measures to prevent risks, such as ordering a business owner to designate a supervisor and instruct work according to his/her work plan, and ordering a subordinate company to start the work of H under the H’s control, which is the subordinate company, to start the work of H, and to take necessary measures to prevent risks.
Defendant
B is a driver of the vehicle affiliated with the above “F”, and the width of a master who supports the occurrence of a blind spot is wide enough to lead to the occurrence of a blind spot. Therefore, there is a high possibility of collision when people have access to the border or for the fore-going moving route, and thus, there was a duty of care to safely drive the vehicle in accordance with the direction of H.
Defendant A, at around October 21, 2017, had Defendant B, a staff member of the foregoing Gu-U.S. factory, engage in the work of moving to the front pressure cable, without preparing a work plan. Defendant A did not instruct or educate Defendant B, a staff member of the foregoing Gu-U.S. factory, to wait for the commencement of H’s work even when H’s work hours, which is the subcontractor, began from 08:30.
In addition, even though the defendant B did not have the director of the work and the H did not have H, the defendant B, alone, without the assistant of the work, performs the cable forum.