Text
1. The plaintiff's appeal is dismissed.
2. The costs of appeal shall be borne by the Plaintiff.
The purport of the claim and appeal is the purport of the appeal.
Reasons
1. Details of disposition;
A. The Plaintiff’s application for building permit 1) The Plaintiff is the Dong-dong, Dong-si, B, 6,321 square meters (hereinafter “instant application site”).
2) 3 Dongs of animal and plant-related facilities (hereinafter “instant facilities”).
In order to newly construct, on September 21, 2018, an application for a building permit in the form of complex civil petitions containing permission for development activities and permission for installation of livestock excreta discharge facilities to the Defendant (hereinafter “instant application”).
(2) At the time of the instant application, the Plaintiff indicated the total floor area of the instant facility as 4,719.26 square meters (1,649.26 square meters per 2,9.26 square meters per 2,92.26 square meters per 1,64.26 square meters per 2,9.74 square meters per 1,64 square meters per 2,99.26 square meters per 1,64 square meters per 26 square meters per 2,000 square meters per 2,000 square meters per 1,00 square meters per 1,000 square meters per 1,000 square meters per 2,000 square meters per 1,000 square meters per 36 meters per 2,000 square meters per 2,000 square meters per 36 meters per 2,000 square meters per 2,000 square meters per 1,
B. As a result of the on-site investigation into the instant application site, the Defendant determined that there was a low difference of about 4.5 meters in the instant application form as a result of the field survey conducted by the fourth unit of the instant application form, and that it is necessary to embling operations. On October 8, 2018, the Defendant again requested the Plaintiff to supplement the period for extending the period for filing civil petition documents by October 18, 2018, by the following: “On October 19, 2018, the Plaintiff shall match the site end map with the site end map by October 19, 2018; indicate the location and structure of the vehicle; the site end map and end map of the entry district by the entry district; the horizontal and cross-section map according to the packing plan (if there is no packaging plan; hereinafter “no packaging plan”); the upper part of the entrance plan; the water supply plan (or underground water); the water supply plan; and the system shipment plan “the civil petition period by October 19, 2018.”