Text
1. The plaintiff's claims against the defendants are all dismissed.
2. The costs of lawsuit shall be borne by the Plaintiff.
Reasons
1. Basic facts
A. It is the building completed with construction permission obtained before June 18, 2001. The building of this case was completed on the first floor below the 1090-8 waterside shopping mall (hereinafter “the building of this case”). The building of this case was completed with the construction permission obtained on or before the 18th of 2001.
The Plaintiff is an insurer who entered into a comprehensive property insurance contract with the subject matter of insurance from October 4, 2009 to October 4, 2010 during the period of the insurance contract between Egyptian and the subject matter of insurance.
B. Defendant East-M Co., Ltd (hereinafter “Defendant East-M”) entered into an elevator inspection agreement with Defendant Ors Elevator Limited Liability Company (hereinafter “Defendant Ors”) regarding the nine elevator units established in the instant building as a controlled entity of the instant building during the contract period from April 1, 2009 to March 31, 201, with respect to the nine elevator units established in the instant building.
Accordingly, the defendant Ors took charge of the inspection and repair of the elevator installed in the building of this case.
다. A은 2010. 8. 9. 19:13경 자신의 모친과 함께 이 사건 건물 지하 2층에서 지하 1층으로 운행하는 수평보행기 형태의 승강기(무빙워크, 이하 ‘이 사건 승강기’라고 한다)에 탑승하여 올라가다가 지하 1층 상부승강장 부근에서 왼손에 들고 있던 숄을 승강기 디딤판에 떨어뜨렸다.
A은 떨어뜨린 숄을 주우려고 하였고, 그 과정에서 숄과 함께 A의 왼손이 이 사건 승강기의 상부승강장 첫 번째, 두 번째 콤(comb, 에스컬레이터 디딤판의 홈과 물려 이물질이 끼이는 것을 방지하는 부품)과 디딤판의 틈새에 끼여 A의 왼손 검지, 중지, 약지, 소지손가락이 절단되는 사고(이하 ‘이 사건 사고’라고 한다)가 발생하였다. 라.
It is 64 million won for damage incurred by A during the instant accident between A and A on November 28, 2011.