logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2016.12.21 2014가단5217733
구상금
Text

1. The Defendant’s KRW 15,479,300 for the Plaintiff and 5% per annum from November 1, 2013 to December 21, 2016.

Reasons

1. Basic facts

A. (1) The Plaintiff is an insurer who has entered into an employer liability insurance contract (hereinafter “instant insurance contract”) with a specialized construction mutual aid association, with a district construction mutual aid company (hereinafter “district construction”), a subcontractor, and the insurance period from September 23, 201 to January 31, 2012 with a view to compensating the insured’s losses arising out of the insured’s legal liability for damages in excess of the amount of accident compensation under the Industrial Accident Compensation Act due to an occupational accident occurred to the insured’s employees. (2) The Central Loen (hereinafter “Central Loen”) Co., Ltd. (hereinafter “Central Loen”) is a company that subcontracted the part of the fire-fighting work among the 2 factory construction works in Seongbuk-gu, Sungwon-gu, Sungwon-gu, A, and (3) C (hereinafter “Reemployed”) is a worker at the site of electrical construction (hereinafter “the instant construction work”).

B. (1) The Defendant is a mutual aid business entity that entered into a motor vehicle mutual aid agreement (hereinafter “instant secondary insurance agreement”) with respect to the D Kacicker (hereinafter “Defendant”) owned by the solar cargo (hereinafter “TT”) from September 30, 201 to September 30, 201, with the insurance period fixed from September 30, 201; and (2) E, as a land owner of the Defendant’s vehicle, was driving the Defendant’s vehicle with the name of “F” with the permission of solar cargo; and (3) G is an employment engineer who is affiliated with F and drives the Defendant’s vehicle.

(c) leased the Defendant’s vehicle, including G, a driver from the Central E, to use it at the construction site of this case.

At around 13:00 on January 13, 2012, the victim was on board the buset of the defendant vehicle driven by G at the construction site of this case and engaged in work at a height of 13 meters.

arrow