(영문) 서울중앙지방법원 2015.03.18 2014가합519288
손해배상(기)
Text

1. The Defendant’s KRW 23,919,00 for the Plaintiff and 6% per annum from April 23, 2014 to March 18, 2015.

Reasons

1. Basic facts

A. The Plaintiff is a company with the purpose of manufacturing, processing, selling, etc. construction materials, and the Defendant is a company with the purpose of interior decoration and interior decoration.

B. On August 31, 2007, the Plaintiff entered into a contract with the Defendant on November 6, 2009 for the supply of water-free household materials (hereinafter “instant supply contract”) to the apartment of this case while performing construction works for the construction of the diesel-type complex apartment (hereinafter “instant apartment”). Accordingly, the Defendant supplied and installed the main household in the instant apartment.

C. The instant apartment was completed on February 2, 201 and was approved for use on February 9, 2011.

On December 12, 2013, the upper president, who was established in the main bank of the instant apartment No. 803 (hereinafter referred to as “803”), was the accident of this case, hereinafter referred to as “the accident of this case, which fell away from the wall and falls below the lower.”

(e)The main room, the lower court, the lower court, and the head of the household (including household appliances, household appliances, etc.) destroyed, and the flably caused damage. E. The Plaintiff newly installed a furniture (or head of the upper department, the lower department, and the head of the household) and the head of the household TV at the 803 main room, and disbursed a total of KRW 34,170,000 in the process of compensating the said damage by performing the tegry restoration work, electrical construction, etc. [In the absence of dispute over the grounds for recognition, the Plaintiff’s testimony or video, the statement or testimony of the evidence No. 1 through 4, A’s evidence No. 6, A’s evidence No. 7, and A’s witness’s testimony.

2. Determination on the cause of the claim

(a) 1) The method of constructing the main upper part of 803 is that the main wall is built, the steel plates are built on the main wall, the steel plates are attached to the studs, and the studs are fixed on the studs after the studs are added to the studs, and the studs are fixed on the studs in the studs.

arrow