(영문) 부산고등법원(창원) 2017.07.13 2016나23727
손해배상(기)
Text

1. Of the judgment of the court of first instance, Defendant Manduk Construction Co., Ltd., which corresponds to the following amount ordered to be paid.

Reasons

Basic Facts

The Plaintiff is the owner of the Eel (hereinafter “instant building”) who is a building of 181.8 square meters and its 7th floor above the land in Changwon-si, Changwon-si.

Defendant Manduk Construction Co., Ltd. (hereinafter “Defendant Co., Ltd.”) is a company that executed the projects for improving G water-related wetlands (hereinafter “instant construction projects”) by contract with Defendant Changwon-si to remove J market (AD) and concrete removal works on the surface of dudu river (hereinafter “previous construction”) conducted in the vicinity of the instant building from Defendant Changwon-si.

In 2010 and around 201, J market and J market removal works were implemented. The separation distance between J market and the building of this case is less than 8 meters, while the removal of concrete on the duct river was implemented around early 2012, but the removal works was also conducted on G duct roads located immediately adjacent to the building of this case.

The instant construction was implemented to improve the stability of the existing retaining wall of G members located in Mhap-gu Hdong. On July 2, 2012, the instant construction was implemented as “H-Ptile Saturdays” in order to maintain the stability of the existing retaining wall and to remove reinforced concrete structures in the foundation, and completed construction on June 21, 2014.

[Attachment 1] During the construction of the existing retaining wall reinforcement construction / [1] / [2] H-pil construction / [3] / [4] He-pil construction / [5] After the completion of retaining wall reinforcement / [6] The present condition of the building of this case and the building of this case were built on April 21, 2003 as a reinforced concrete structure of the ground-based 7th floor of the elevator room, stairs room and guest room, floor heating and bed, outer walls and polluted water, rupture of outdoor parking lot, etc.

(b).