(영문) 청주지방법원제천지원 2020.12.09 2020가단20667
손해배상(기)
Text

Plaintiff

A,

A. Defendant C and D jointly share KRW 26,950,240, and their related thereto from December 24, 2019 to December 9, 2020.

Reasons

1. Basic facts

A. On March 8, 2017, the Plaintiffs entered into and implement a sales contract with Defendant C and D, and each of the real estate listed in the separate sheet, each of which the Defendants shared at the ratio of 1/2 shares, are purchased at KRW 945,00,000 (hereinafter “instant sales contract”).

(2) Defendant E, a licensed real estate agent, arranged the instant sales contract. The Plaintiffs paid KRW 945,00,000 for the purchase price under the instant sales contract to Defendant C and D, and completed the registration of ownership transfer on May 31, 2017 for 1/2 shares of each real estate listed in the separate sheet.

B. On October 5, 2018, the Plaintiffs, who entered into a lease agreement with respect to the third floor, leased the third floor part of the building indicated in attached Table 3 (hereinafter “instant building”) to F, with the term of lease from October 26, 2018 to October 25, 2020, the lease deposit of KRW 15,000,000, and the rent of KRW 600,000 per month.

C. On April 2019, the Plaintiffs were to undergo a fire-fighting inspection of the instant building from the Jeju Fire Fighting Station around the third floor without permission. During that process, the storage of the prefabricated-style panel structure located on the land specified in paragraph (1) of the attached Table (hereinafter “instant land”) (hereinafter “unauthorized warehouse”) was constructed without permission. Of the third floor of the instant building, the fact that one room for the right side, one toilet and bath room, one total of 21.63 square meters of the multi-use room (hereinafter “the third floor extension without permission”) was recognized.

Around August 12, 2019, the Plaintiffs agreed to enter into a lease agreement with F on the third floor of the instant building that was concluded between F around August 12, 2019 to remove the third-story unauthorized Construction Extension. The Plaintiffs paid F KRW 900,000 as the director’s fee.

After F leaves from the Republic of Korea, the Plaintiffs from October 1, 2019 to October 23, 2019.