(영문) 특허법원 2019.07.19 2018허8371
권리범위확인(특)
Text

1. The decision made by the Intellectual Property Tribunal on September 28, 2018 on the case No. 2018DaDa2029 is revoked.

2. The costs of lawsuit shall be.

Reasons

1. Basic facts

A. The title of the instant patent invention 1: E2) filing date/registration date//H3: The claim 1) 【 Claim 1】 Claim 2】 Claim 2 / Claim 2 / Claim 10 / The two panel (100) / The two panel (100) / the two panel (100) / the two panel (100) / the two panel (100) / the two panel (100) / the two panel (10) / the part (C) / the part (10) / the part (hereinafter referred to as “part 1”) / the part (hereinafter referred to as “part 1”) / the part (hereinafter referred to as “part 1”) / the part (G) / the part (hereinafter referred to as the “part 1”) / the part (hereinafter referred to as the “part 1”).

(i) In the case, the above 100 shall have been formed on the first surbling (111) and formed on the upper side of the other side (112); and the first surbling (10); and the first surbling (121) formed on the first surbling (11) formed on the first surbling (11) formed on the first surbling part of the surbling panel so that it may be opposite and corresponding to the other side (111) and combined with the second surling (122) formed on the other side; hereinafter referred to as “consurbing parts 2”.

(C) The construction method of the structure using PCS-month (hereinafter referred to as the “instant Claim Nos. 2”) characterized by its characteristics (hereinafter referred to as the “instant Claim Nos. 3 and the remaining claims are also described in the same way). In Section 2 of the Claim No. 3, the above-mentioned Claim No. 1 is found to have been covered by PCSB (200) above, and the site concrete (C) is removed from the upper part of the PCSBB (200), and thus, the floor of the underground floor or the upper floor (F) is formed, but the above-site concrete (C) is discharged into the space (G) of the panel so that it is combined with the outer wall (hereinafter referred to as the “part No. 3”).

) The method of constructing structures that use sandd-months with their distinctive features [technical field] [the instant invention has a set of a multiple cream panel in constructing various structures, including excellent storage tanks, underground parking lots, hospitals, large-scale discount stores, etc.