(영문) 대구고등법원 2018.07.20 2016누6987
손실보상금
Text

1. The plaintiff's appeal against the defendants is dismissed in entirety.

2. The costs of appeal shall be borne by the Plaintiff.

purport, purport, and.

Reasons

1. Details, etc. of ruling;

A. On January 4, 1995, the Daegu Metropolitan City Mayor decided an urban planning project (market site creation project) zone with respect to the area of a urban planning project (market site creation project) with respect to the area of 262,00 square meters in Daegu-gu, Daegu-dong CBdong, Daegu-dong, Daegu-gu, Daegu-gu, as a public notice of the Daegu Metropolitan City on January 4, 1995, and decided to install three kinds of roads (hereinafter “instant roads”) as the area consisting of 25 meters in width, 1,010 meters in width, 1,010 meters in

(hereinafter “Determination of Urban Planning” as of January 4, 1995, and the topographical map attached at the time is “Determination of Urban Planning” as of January 4, 1995. The Daegu Metropolitan City Mayor decided to establish a detailed urban planning planning with the numbers of the instant roads N in the Daegu Metropolitan City Public Notice of November 5, 1997, and publicly announced the cadastral approval drawings approved by the Minister of Construction and Transportation, specifying the matters of the said urban planning.

(hereinafter referred to as “cadastral published drawings of November 5, 1997”). (b)

대구광역시 북구청장은 2006. 12. 11. 대구광역시북구 고시 O로 이 사건 도로의 가각전제(街角剪除, 도로 교차지점의 교통을 원활하게 하고 시야를 충분히 확보시키기 위하여 도로모퉁이의 길이를 기준 이상으로 넓히는 것)를 변경하는 지구단위계획 결정(변경) 및 지형도면 작성(승인) 고시를 하였다

(hereinafter “Determination to alter the urban planning on December 11, 2006”) and the topographical map attached at the time is the “decision to alter the urban planning on December 11, 2006” (hereinafter “decision to alter the urban planning”).

On April 1, 2013, the Daegu Metropolitan City Mayor publicly announced the Daegu Metropolitan City Mayor on April 1, 2013, publicly announced the designation of a project operator who designates the project operator of the North-gu BC Si development project (hereinafter referred to as the “instant project”) as an international trust corporation with respect to the 38,616 square meters of the 38,616 square meters of the Seoul Northern-gu Seoul Metropolitan City in the urban planning project area in which the instant road, etc. was installed, and publicly notified on May 10, 2013 as the G of Daegu Metropolitan City with the implementation plan attached to the relevant topographical map.

hereinafter “Authorization of Implementation Plan of May 10, 2013” and attached at the time.