Text
1. The plaintiff's appeal against the defendants is dismissed in entirety.
2. The costs of appeal shall be borne by the Plaintiff.
purport, purport, and.
Reasons
Basic Facts
1. Until February 28, 2005, Defendant B connected the Plaintiff with each point of the attached Table 2 protocol Nos. 1, 2, 11, 12, and 1 among the annexed Table Nos. 602 square meters in Chungcheongnam-gun G, Chungcheongnam-gun, Chungcheongnam-gun, and the part (B) in the ship connecting each point of the above map Nos. 2, 3, 10, 11, and 2 among the attached Table Nos. 1369 square meters in sequence; the part (c) connecting each point of the above map Nos. 3, 4, 9, 10, and 3 among the E field Nos. 1369 square meters in sequence; the part (d) connecting each point of the above map No. 4, 5, 8, 9, 41 square meters in sequence among the above map No. 1431 square meters in the ship; and the part (d) connecting each point of the above map No. 525,57,57,7, and 57) in order in the ship.
However, the costs of the divisional survey shall be borne by the plaintiff.
2. By February 28, 2005, the Plaintiff shall pay to the Defendant B the amount calculated as KRW 300,000 per square meter with respect to the part of the above sub-paragraph (a) through (e) and KRW 10 million per square meter.
4. The plaintiff consented to the use of the above part of the defendant B's above (a) through (e) without compensation and does not raise any objection.
On January 7, 2005, the Plaintiff asserted that Defendant B, the owner of the surrounding land, had a right to passage over surrounding land, etc. as to the part of the land indicated in the conciliation protocol No. 2 (a) through (e) as to the land indicated in the land indicated in the protocol No. 2 (a) through (e), filed an application against Defendant B for a provisional disposition for prohibition of interference with passage under the Seosan Branch of the Daejeon District Court as Seosan Branch of Daejeon District Court 2004Kahap253. In the above case, the following conciliation was concluded on January 7, 2005:
(hereinafter “instant conciliation”). On February 24, 2005, Defendant B divided the instant land into 209 square meters among the E field in Chungcheongnam-gun, Chungcheongnam-gun, Chungcheongnam-do, and 159 square meters among the said land, 74 square meters among the L field, 60 square meters among the L field, 117 square meters among the L field, 153 square meters among the N field, and 772 square meters among the L field, and each part of the divided land became the instant land with a parcel number D.
It is called 'Pri 00 lot number land' according to the lot number if Pririri land in Yan-gun, Chungcheongnam-gun.